OEM Production & Line Performance

Meridian Auto Components — Real-time operational intelligence

Overall OEE
78.4%
-2.1%
Takt Adherence
91.2%
+0.8%
First-Pass Yield
95.3%
+1.2%
Scrap Cost/Unit
$142
+$18
Plan Attainment
96.8%
+0.3%
Unplanned DT
847min
+124

OEE by Line × Shift

Day
Evening
Night
Line 1
82.1%
84.3%
79.8%
Line 2
86.2%
81.9%
83.7%
Line 3
78.4%
80.6%
76.9%
Line 4
72.3%
69.1%
73.8%
Line 5
85.9%
88.1%
84.2%

Downtime by Root Cause (Week)

Takt Adherence Trend (13 Weeks)

First-Pass Yield by Station Cluster

Changeover Duration vs. Standard

Product Family Std (min) Actual (min) Variance
SUV Platform A4247+5
EV Platform B3841+3
Truck Platform C5149-2
Hybrid Platform D4552+7
Sedan Platform E3635-1

Andon Response Time Distribution

Median: 4.2 min
P95: 8.7 min
0-3 min
42%
3-6 min
31%
6-10 min
19%
>10 min
8%

Supplier Lot Holds (Last 30 Days)

Lot ID Material Line Stops Impact ($K)
L-8842Weld Wire18$284
L-9103Paint Base5$67
L-8791Fasteners3$41
L-9227Sealant7$93
L-8649Adhesive2$28

Data as of Week 7, 2024 • Line 4 FPY recovered to 95.3% after L-8842 weld wire contamination remediation • Target CPQV reduction: 12% YoY