Capital Planning & Retrofit ROI Program Management

Alliance Data Centers • Five-Year Retrofit Program

Pipeline NPV
$14.2M
+18% vs plan
Weighted Avg Payback
3.8y
-0.4y improved
Realized vs Projected
-7%
Within ±10% target
Active Projects
22
Across 4 stages
Cumulative Realized
$4.1M
vs $4.4M projected

Stage-Gate Pipeline Funnel

Realized vs Projected Savings Bridge

Top 15 Projects by NPV

Project NPV Stage
CRAC Opt. - Phoenix$2.1MM&V
LED Retrofit - Atlanta$1.8MM&V
BMS Upgrade - Dallas$1.5MImpl
Chiller VFD - Seattle$1.3MApprvd
Heat Recovery - Chicago$1.1MPipeline
LED Retrofit - Phoenix$0.9MM&V
CRAC Opt. - Dallas$0.8MApprvd
UPS Efficiency - Boston$0.7MPipeline
Economizer - Atlanta$0.6MApprvd
BMS Upgrade - Phoenix$0.5MImpl

Project Variance Heatmap by Assumption Driver

Base kWh
Load Factor
Rate $/kWh
Install Cost
Eff Gain %
Uptime
O&M Δ
Lifespan
CRAC Phoenix
+3%
+2%
0%
+5%
+1%
0%
+2%
0%
LED Atlanta
+4%
0%
+1%
-2%
+2%
0%
+3%
0%
BMS Dallas
-18%
-5%
0%
-8%
-6%
-3%
+1%
0%
Chiller Seattle
-1%
+2%
0%
+1%
+3%
0%
+2%
0%
Heat Rcv Chicago
+5%
+3%
+2%
0%
+4%
0%
+1%
0%

Carbon Abatement Cost Curve

Budget Utilization vs Approved Program

80% Utilized
$17.6M / $22.0M
$4.4M remaining budget

M&V Plan Compliance

94%
17 of 18 projects on schedule

Uptime Improvement

+2.3%
Linked to completed projects

Tranche 3 Funding Readiness

82
Score pending variance closure
82/100

BMS Upgrade Dallas: -22% Variance Alert

Realized savings significantly below projection. Root cause analysis identifies baseline year adjustment needed and control sequence optimization gap.

Projected: $820K/yr
Realized: $639K/yr
Baseline Issue: -$105K
Control Gap: -$76K

Corrective M&V Action Plan

Re-baseline using 24-mo pre-period
Target: +$95K recovery
2
Tune VAV damper & temp setpoints
Est. +$68K/yr additional
3
Extended M&V to 18 months
Validate stabilization by Q3
Program Charter v2.1 | Approved Budget: $22.0M | Active Period: FY2023-FY2027
Finance Close: Dec 2024 | Next Steering: Jan 15, 2025