Route Optimization & Delivery Performance

On-Time Delivery Rate
93.7%
-1.8% vs target
Route Efficiency
104.2%
+2.2% excess
Cost per Delivery
$22.40
-$0.60 vs last mo
SLA Penalties (MTD)
$34.2K
Kroger contract
Avg Dwell Time
18.3m
+3.1m vs plan
Routes Completed
2,147
30 days

Daily OTD Rate vs. SLA Penalty Exposure (30 Days)

Plan vs. Actual Gap Decomposition

Delivery Window Performance by Hour

Route Execution Detail (Today + Trailing 7 Days)

Route ID Service Area Planned Miles Actual Miles Efficiency % OTD % Avg Dwell Status
R-2847 Asheville Urban 87.2 93.6 107.3% 88.9% 21.4m 2 SLA miss
R-1923 Charlotte Metro 112.8 114.1 101.2% 100% 15.2m On target
R-3104 Raleigh-Durham 96.4 101.8 105.6% 91.7% 19.8m 1 SLA miss
R-4562 Greensboro 78.3 80.1 102.3% 95.8% 16.9m On target
R-2136 Asheville Urban 91.7 99.2 108.2% 85.7% 23.6m 3 SLA miss
R-3387 Charlotte Metro 105.2 106.9 101.6% 100% 14.8m On target
R-4891 Knoxville 134.6 138.2 102.7% 97.1% 17.3m On target
R-5024 Raleigh-Durham 88.9 95.4 107.3% 90.0% 20.1m 1 SLA miss

Stops/Route by Service Area

Customer Facility Performance Matrix

Route R-2847 Stop-Level Timeline (Yesterday)

Planned
Actual
Planned window
Actual on-time
Late/overage
Breakdown: 9 stops planned. Stop 3 (Kroger DC-14): 14m dwell overage (receiving dock delay). Stop 6 (Food Lion #2387): 11m overage (forklift unavailable). Stop 9: arrived 28m late, SLA miss. Route efficiency: 107.3% due to traffic detour on US-25.
Blue Ridge Distribution Services ยท Last updated: 2024-01-15 14:23 EST