Process Cycle Time & Throughput Optimization

Revenue/Prod Hr
$4,218
+8.2%
Bottleneck P90
8.4 min
+16.7%
Throughput Yield
126 u/hr
+5.0%
WIP Queue (St3)
47 units
Target: 20
First-Time Through
94.3%
+1.8%
Avg Changeover
18.2 min
-12.5%

Process Flow with WIP Queue Indicators

Stage 1
Material Prep · 126 u/hr
12 WIP
Stage 2
Rough Machine · 128 u/hr
18 WIP
Stage 3
CNC Bore · 119 u/hr
47 WIP
Stage 4
Thread Cut · 135 u/hr
22 WIP
Stage 5
Finish & Polish · 132 u/hr
15 WIP
Stage 6
Inspection · 140 u/hr
8 WIP
Stage 7
Packaging · 145 u/hr
5 WIP
Constraint Identified: Stage 3 (CNC Bore) — P90 cycle time 8.4 min vs. 7.2 min baseline. WIP queue 47 units (2.35× buffer target).

Cycle Time Distribution by Stage

Box: P25–P75 | Whiskers: Min–Max | Line: P50 Median | Red: P90

Stage Utilization Breakdown

Green: Productive | Yellow: Changeover | Red: Idle/Waiting

Throughput Yield & WIP Level — Weekly Dual Axis

Stage Cycle Time CV — Variability Index

CV = StdDev/Mean · Higher CV indicates process instability

FTT Rate by Product Family

Process Stage Performance Matrix

Stage P50 Cycle (min) P90 Cycle (min) WIP Queue Utilization FTT Rate CV
Stage 1: Material Prep 3.2 4.1 12 82% 98.2% 0.18
Stage 2: Rough Machine 4.1 5.3 18 78% 96.8% 0.22
Stage 3: CNC Bore ⚠ 6.8 8.4 47 91% 95.1% 0.31
Stage 4: Thread Cut 3.8 4.9 22 74% 97.3% 0.21
Stage 5: Finish & Polish 4.5 5.7 15 76% 93.8% 0.24
Stage 6: Inspection 2.9 3.6 8 71% 94.3% 0.19
Stage 7: Packaging 2.4 3.1 5 69% 99.1% 0.16