| Stage | P50 Cycle (min) | P90 Cycle (min) | WIP Queue | Utilization | FTT Rate | CV |
|---|---|---|---|---|---|---|
| Stage 1: Material Prep | 3.2 | 4.1 | 12 | 82% | 98.2% | 0.18 |
| Stage 2: Rough Machine | 4.1 | 5.3 | 18 | 78% | 96.8% | 0.22 |
| Stage 3: CNC Bore ⚠ | 6.8 | 8.4 | 47 | 91% | 95.1% | 0.31 |
| Stage 4: Thread Cut | 3.8 | 4.9 | 22 | 74% | 97.3% | 0.21 |
| Stage 5: Finish & Polish | 4.5 | 5.7 | 15 | 76% | 93.8% | 0.24 |
| Stage 6: Inspection | 2.9 | 3.6 | 8 | 71% | 94.3% | 0.19 |
| Stage 7: Packaging | 2.4 | 3.1 | 5 | 69% | 99.1% | 0.16 |