Energy & Sustainability Operations

Real-time energy efficiency monitoring and carbon tracking

Current Period
Dec 2024
North Star Metric
4.7%
Energy Cost per Unit of Revenue
+0.9%
vs. 3.8% target
$280K/yr impact per 0.01/kWh
Energy Intensity
4.82
kWh/unit (target: 4.31)
+11.8%
Peak Demand
2,156
kW (limit: 2,200 kW)
98% utilized
Air System Eff.
3.7
cfm/kW (target: 4.0+)
Leak alert
Carbon Intensity
2.14
kg CO2e/unit
+2.4%
Demand Charge
38%
of electric bill
Above 35%
Renewable Offset
18%
target: 40% by 2026
+3% MoM

Energy Intensity Trend (52-Week)

kWh per Unit Produced

Peak Demand Monitoring (Current Billing Period)

Machine Energy vs. Baseline

Natural Gas Consumption vs. Heating Degree Days

Efficiency Project ROI Tracking

Project Capex Projected Savings Actual Savings % of Projection Status
LED Retrofit (Bldg A) $47K 82,000 kWh/yr 79,400 kWh/yr 97% On Track
VFD on Air Compressor #2 $28K 125,000 kWh/yr 118,200 kWh/yr 95% On Track
HVAC Controls Upgrade $62K 94,000 kWh/yr 68,100 kWh/yr 72% Review
Boiler Economizer $112K 210 MMBtu/yr 223 MMBtu/yr 106% Exceeds
Insulation Repair (Roof) $34K 168 MMBtu/yr 151 MMBtu/yr 90% On Track
Leak Detection & Repair (Compressed Air) $18K 156,000 kWh/yr 124,800 kWh/yr 80% Monitoring
Solar PV (Phase 1) $420K 340,000 kWh/yr 358,200 kWh/yr 105% Exceeds
Motor Replacement Program $51K 102,000 kWh/yr 96,900 kWh/yr 95% On Track
Portfolio Summary: 6 of 8 projects meeting or exceeding 90% of projected savings. HVAC Controls project flagged for technical review — potential commissioning issue with scheduling setpoints.

Manufacturing Energy & Sustainability Dashboard • Data refreshed every 15 minutes • Integration: Schneider EcoStruxure, ERP, Utility APIs