Energy & Sustainability Operations — Nexvara Manufacturing, Houston TX
Real-time energy intensity, emissions tracking, and cost optimization across 5 production lines
Wed 12-18 spike: Line 4 HVAC failure caused 5.8 kWh/unit intensity and $31.2k peak demand charge
| Line ID | Process | Energy Intensity | Carbon Intensity | Water L/unit | Uptime % | Status |
|---|---|---|---|---|---|---|
| Line 1 | Extrusion | 3.2 kWh | 1.68 kg | 12.4 | 94.2% | On Target |
| Line 2 | Compounding | 4.1 kWh | 2.15 kg | 8.7 | 92.8% | On Target |
| Line 3 | Injection Molding | 2.8 kWh | 1.47 kg | 6.3 | 96.1% | On Target |
| Line 4 | High-Temp Polymer | 5.2 kWh | 2.73 kg | 15.2 | 87.4% | Action Req |
| Line 5 | Pelletizing | 2.1 kWh | 1.10 kg | 4.8 | 95.7% | On Target |