MoldTech Precision | Real-time Cost of Poor Quality & Scrap Reduction Analytics
| SKU | Product Family | Line | Std Cost | FPY | FPY Var | Scrap Cost | Rework Hrs | Total COPQ |
|---|---|---|---|---|---|---|---|---|
| SKU-C1 | Medical Housing | Line 2 | $94.00 | 91.8% | -3.2% | $76,420 | 184 | $89,240 |
| SKU-D3 | Precision Valve | Line 2 | $68.50 | 93.9% | -1.1% | $38,620 | 96 | $45,860 |
| SKU-A2 | Connector Assembly | Line 1 | $52.30 | 94.4% | -0.6% | $28,940 | 72 | $34,120 |
| SKU-B5 | Medical Housing | Line 1 | $41.80 | 95.2% | +0.2% | $18,240 | 54 | $22,680 |
| SKU-E7 | Sensor Mount | Line 3 | $34.20 | 96.1% | +0.8% | $12,860 | 38 | $16,140 |
| Defect Mode | Frequency | Root Cause | Contributing Factor | Cost Impact | Action Status |
|---|---|---|---|---|---|
| Dimensional OOT | 284 | Coolant pH Drift | Line 2 Day 22-24 mean shift | $76,420 | In Progress |
| Surface Finish | 142 | Tool Wear | Extended tool life policy | $38,940 | Planned |
| Flash / Burr | 96 | Clamp Pressure | Line 3 setup variation | $24,160 | Monitoring |
| Short Shot | 68 | Material Viscosity | Resin lot variability | $18,720 | Resolved |