Shop Floor Quality Control & Defect Reduction

Precision Dynamics Manufacturing Co. • AS9100D Certified • 13-Week Rolling Period

COPQ % of Revenue
8.4%
↓1.8% vs 13w ago
Monthly COPQ
$371K
Target: $264K (6.0%)
Total DPMO
3,847
↓14% vs 13w ago
Avg Cpk (Critical CTQs)
1.21
Below 1.33 target
Escape Rate
1.8%
18 units to customer
First-Pass Yield
91.2%
↑2.4% vs 13w ago

Cost of Poor Quality Waterfall — Monthly Breakdown

Defect Pareto by Code (Last 30 Days)

Defect Rate by Shift

SPC Control Chart — Bore Diameter (Cell 3, Part Family 3)

Target: 25.000 mm ±0.015 mm • UCL/LCL: 25.010/24.990 mm • Cpk recovering post-insert replacement (Week 10)

Cpk Trend by CTQ (Last 13 Weeks)

Wk 1
Wk 5
Wk 9
Wk 13
Bore Dia
1.08
1.16
1.24
1.29
Surface Finish
1.41
1.38
1.42
1.44
Perpendicularity
1.22
1.25
1.28
1.33
Hardness
1.52
1.49
1.51
1.54
Cpk ≥ 1.33 (Excellent)
1.00–1.32 (Adequate)
< 1.00 (Unacceptable)

Rework Labor Hours by Defect Code

Supplier Quality DPMO (Top 5)

First-Pass Yield by Material Lot

Containment Effectiveness Rate (Last 13 Weeks)

Gauge R&R Status by Measurement System

Measurement System Part/Characteristic Last Study Date GRR % Status Next Due
CMM-001 Bore Diameter (CTQ) 2024-02-14 8.2% Excellent 2024-08-14
SJ-410 Surface Finish Ra 2024-01-22 12.4% Adequate 2024-07-22
CMM-002 Perpendicularity GD&T 2024-03-05 9.1% Excellent 2024-09-05
RB-3000 Hardness HRC 2024-02-28 6.7% Excellent 2024-08-28
MIC-7500 Thread Pitch Diameter 2023-11-18 18.9% Marginal 2024-05-18
PRO-5K Profile Tolerance 2024-01-10 14.5% Adequate 2024-07-10
OGP-ZIP Hole Position XY 2024-03-12 7.8% Excellent 2024-09-12
CAL-450 Caliper OD Meas 2023-10-03 31.2% Unacceptable 2024-04-03 (OVERDUE)

Quality Escape & Corrective Action Timeline (Last 90 Days)