Process Throughput & Cycle Time Optimization — Meridian Industrial Components
| Stage | Avg Cycle (h) | Queue Depth | Throughput | FPY % | Util % | Rework % |
|---|---|---|---|---|---|---|
| Raw Material Prep | 0.6 | 12 | 52.1 | 98.2 | 87 | 1.8 |
| CNC Milling | 1.8 | 34 | 48.3 | 93.7 | 82 | 6.3 |
| QA Check | 3.1 | 78 | 41.2 | 87.4 | 67 | 12.6 |
| Rework Station | 2.2 | 18 | 9.4 | 95.1 | 73 | 4.9 |
| Assembly | 1.4 | 22 | 46.8 | 94.3 | 89 | 5.7 |
| Final Inspection | 0.9 | 16 | 47.6 | 96.8 | 91 | 3.2 |
| Packaging | 0.4 | 8 | 49.2 | 99.1 | 94 | 0.9 |
| Shipping Prep | 0.3 | 5 | 50.1 | 99.4 | 88 | 0.6 |