Helix Industrial Systems – Constraint-aware operations view
| Cell ID | Line | Utilization % | Throughput Units/hr | SER % | Changeover min | WIP Turns/Day | Status |
|---|---|---|---|---|---|---|---|
| Cell-7 | Line 2 | 96.4 | 12.8 | 84.1 | 42 | 3.2 | Constraint |
| Cell-9 | Line 2 | 91.8 | 18.4 | 86.3 | 35 | 4.1 | High |
| Cell-8 | Line 2 | 90.2 | 21.2 | 88.7 | 31 | 4.8 | High |
| Cell-3 | Line 2 | 88.5 | 16.9 | 82.9 | 38 | 3.7 | High |
| Cell-5 | Line 2 | 85.4 | 19.6 | 81.2 | 40 | 4.3 | Normal |
| Cell-3 | Line 1 | 84.6 | 17.1 | 79.8 | 44 | 3.5 | Normal |
| Cell-6 | Line 2 | 84.0 | 22.4 | 83.5 | 33 | 5.1 | Normal |
| Cell-1 | Line 2 | 83.2 | 15.8 | 80.4 | 41 | 3.9 | Normal |