Advanced Composites Manufacturing | Real-time Production Energy Monitoring
| Machine ID | Total kWh | kWh/Part | Idle % | Peak kW | Cost/Unit | Status |
|---|---|---|---|---|---|---|
| CNC-1 | 24,680 | 3.42 | 8.2% | 62.4 | $0.74 | Optimal |
| CNC-2 | 22,140 | 3.38 | 16.4% | 58.9 | $0.78 | High Idle |
| CNC-3 | 22,080 | 3.51 | 9.1% | 61.2 | $0.76 | Optimal |
| Heat-Treat-1 | 32,450 | 6.82 | 18.6% | 124.3 | $1.42 | High Idle |
| Heat-Treat-2 | 23,750 | 6.48 | 11.2% | 118.7 | $1.35 | Normal |
| Molding-1 | 18,920 | 2.14 | 6.8% | 48.2 | $0.52 | Optimal |
| Molding-2 | 20,180 | 2.28 | 7.4% | 52.1 | $0.56 | Optimal |